Briefly introduce the installation method of bamboo wood fiber integrated wallboard
Briefly introduce the installation method of bamboo wood fiber integrated wallboardBamboo wood fiber integrated wallboard is made of sawdust, wood chips, bamboo chips and other low plant biomass fibers. It uses the principle of polymer interface chemistry and the characteristics of plastic filling and modification. The whole production process does not contain any glue components, which is completely avoided. The material is harmful to the human body due to the release of formaldehyde. And because of the dual characteristics of wood and plastic, it has abandoned the defects of wood and plastic, and can be used in many fields to replace logs, plastics and aluminum alloys. The market has broad application prospects. Bamboo wood fiber has good breathability, instant water absorption, strong wear resistance and good dyeability, as well as natural antibacterial, bacteriostatic, mite removal, and deodorant functions. Because the traditional glue bonding method is abandoned, the formaldehyde in the glue is isolated, plus the raw materials are natural wood chips and bamboo chips, no toxic substances, no pollution, no pollution, no smell after decoration, and also have Certain sound absorption effect.
Bamboo wood fiber integrated wallboard is a new type of environmentally friendly decoration material. For the problem of how to install the integrated wall surface, people who know the industry think it is very simple. However, the carpenter master who had been in contact with the previous one may feel that it is impossible to start. Integrated wall installation must be combined with drawings to analyze, what is installed first, what is installed, and what board is installed? The construction drawings should be specified in detail, and the tools used for decoration should be prepared in advance.
Bamboo wood fiber integrated wall panel
The installation sequence of the bamboo and wood fiber integrated wall surface: first top and then the wall, then the plate and then the line, from bottom to top, from the outside to the inside.
Top-to-wall means that the ceiling is installed before the wall is installed. When installing the ceiling, the keel needs to be fixed first; the integrated front wall of the front wall must be fixed on the wall with a buckle. After each installation, one side is buckled on the front integrated wall, and the other side is fixed with steel nails. . Attention should be paid to the overall screen design during installation. The grid lines should be first installed according to the pre-designed drawings. If you encounter the location of the socket, you need to reserve the socket in advance. First board first, then the main board is installed first, then the lines are installed, the large area is installed first, and then the details such as corners and edges are processed. If you encounter a post, you can use the slotted back to wrap the post. Bottom-up refers to the installation of the wall, starting from the bottom of the wall, and gradually increasing upwards until the entire wall is installed. From outside to inside refers to the order of installation from the wall of the room entrance door to the inside. This is because the rear part needs to be cut, and the installation from outside to inside is more beautiful.
If you want to know more about it please do not hesitate to
contact me. WhatsApp:+86-15966835076.