Precautions for installation and construction of PE hollow winding pipe
Precautions for installation and construction of PE hollow winding pipe 1. The pipe mouth should be aligned, and the pipe connection process should be careful, and avoid contamination of the interface. It is not allowed to move the pipeline within 30 minutes after the pipeline is connected. 2. The heating time of the pipeline and shrinkage belt should be moderate, otherwise the connecti