Carat tube production line-quality first
Carat tube production line-quality firstThe carat tube production line is controlled by PLC by the frequency of cylinder movement. Therefore, the internal clock of the PLC can be set to adjust the wire feeding speed. The wire feeding speed should match the wire winding speed, and there is a sufficient length to make it swing freely. When starting up, first press the reset button to return to the initial working position, and then do not put on the copper wire first, and see if the cylinder movement is harmonious after empty operation, and the air intake and exhaust of the cylinder can be properly adjusted to make the movement harmonious. After the empty operation is harmonious, put on the copper wire, turn on the wire feeding and winding operation knobs, start wire feeding and winding, and wait for the wound wire to reach the wire rack, hang the wire on the wire reel, and then rewind Wire manipulation. When winding the wire, the wire feeding of the PE plastic drainage pipe equipment is completed by the movement of the cylinder.
Carat tube equipment has never failed to wind the wire occasionally. The reason is that the threaded screw is not in place, so the threaded rod fails to block the copper wire. The root cause of the PE-wrapped reinforced tube equipment is usually the wire feeding question. After solving the wire feeding question, just move the copper wire with your hand to assist the machine to finish the action. When winding the silk, because the formed silk twists upwards, it brings difficulties to the winding of the winding. At this time, the formed ribbon can be rotated 180 degrees, so that the curvature of the winding and the winding axis are the same, so that the winding can be neatly coiled. Copper wire rolls. The paper tape can also be installed on the paper roll holder and laid on each layer of ribbon.
If you want to know more about it please do not hesitate to
contact me. WhatsApp:+86-15966835076.