How to install uv imitation marble board
1. Construction preparation: 1. Materials and accessories: (1), marble window sill production material: stone window sill board (2), marble window sill production material variety, material, color should be selected according to design, wood products should be dried , Control moisture content within 12%, and do anti-corrosion treatment, no distortion is allowed. (3), installation and fixation is made of angle steel or flat steel as a bracket or hanger; the structure of the marble window sill is generally directly installed on the surface of the wall under the window, and stabilized with mortar or fine stone concrete. 2. Main tools: (1), electric tools: electric welding machine, electric saw machine, hand electric drill. (2), hand tools: large planer, small planer, small saw, hammer, cutting square, rubber hammer, ruler board, No. 20 lead wire and small wire, iron level, box ruler, screwdriver 3. Operating conditions: (1). The lower wall of the window installed with a special marble sill board shall be embedded with wooden bricks or iron parts according to the type of sill board selected during structural construction. (2) When the window sill is longer than 1500mm, in addition to the wooden bricks or iron fittings at both ends of the window, 3 water treatment bricks or iron fittings should be added every 500mm in the middle; the span window sills should be fixed according to the design requirements support. (3) The installation of the marble window sill should be carried out after the installation of the window frame. Where the window sill is conjoined, it shall be carried out after the wall and the ground decoration layer are completed.
If you want to know more about it please do not hesitate to
contact me. WhatsApp:+86-15966835076.