+86-15966835076 sales@plastmachine.cn
5. Attention should be paid to backfilling the soil: 1. The axillary corner should be filled with medium sand and coarse sand first. 2. The foundation should be within 0.7m above the pipe top groove. Manual backfill must be used. 3. The pipe top should be more than 0.7m The machine can be backfilled and compacted along both sides of the pipeline axis at the same time.